Owner: Boston University

Completion: 2024

Services Provided: Cost Estimating, Cost Management

Boston University Mugar Library Renovation

Boston, MA

Located at the heart of Boston University’s Charles River Campus, Mugar Memorial Library is BU’s main humanities and social sciences library. It was constructed in the mid-1960s as part of a four-building complex designed by Josep Lluis Sert. For 50 years, only minor improvements have been made to the 200,000 SF facility. Mugar’s seven stories house computing facilities, 2.2 million books, and many other resources.

This total building rehabilitation brings mechanical systems and library services up to modern standards. Ellana prepared cost estimates for this extensive renovation. Our estimates include mechanical system elements, life safety systems, electrical, FF&E, and movable partitions. It is anticipated that sections of the structure will be occupied during construction.

Owner: Bridgewater State University

Completion: 2025

Services Provided: Cost Estimating, Cost Management

Bridgewater State University Campus Master Plan

Bridgewater, MA

Bridgewater State University (BSU)’s 278-acre campus requires continuous and strategic investment in upgrading its existing buildings and physical facilities, reducing the backlog of deferred maintenance, and modernizing its infrastructure. The university is also committed to enhancing sustainability, reducing its carbon footprint, securing additional public and private resources, and leveraging external partnerships to meet the needs of our campus community. The Goody Clancy team was selected to renew BSU’s long-term master plan to take account of changing space needs and demands while establishing these strategic capital priorities.

Ellana served as cost estimator on this comprehensive master plan project that involved 212,720 SF of phased additions and renovations to a variety of one to four-story structures that includes historic buildings. Modernized office space and wellness are the focus across campus.

Program areas affected by the master plan include library/learning commons, interdisciplinary humanities department, administrative & academic areas, art center, innovation hub, and the Flight Training Center.

Photo by Dom Fou on Unsplash

Owner: Cape Cod Community College

Completion: Ongoing

Services Provided: Cost Estimating, Cost Management

Cape Cod Community College Roof Replacements and Structural Repairs

Barnstable, MA

Cost estimating for a roof replacement at Cape Cod Community College. Located in West Barnstable, MA, Cape Cod Community College was established in 1961 and was the second community college to open in Massachusetts. Roof structual repairs and replacements were needed, along with an add alternate included, on 5 buildings throughout the campus, all while being occupied.

Owner: City College of New York

Completion: Ongoing

Services Provided: Cost Estimating, Cost Management

CCNY Aaron Davis Hall

New York, NY

Aaron Davis Hall is the primary performing arts facility for the City College of New York (CCNY). The building houses three venues: a 629-seat proscenium theater, a 110 to 265-seat black box theater, and a 75-seat flexible studio and teaching space. The renovation includes an accessibility upgrade, expansion of seating capacity, major upgrades to lighting, rigging and AV/IT control systems and an architectural refresh of the main lobby and significant public spaces. Ellana provided cost estimating services for this cultural project.

Owner: Columbia University

Completion: 2021

Services Provided: Cost Estimating

Columbia University Alfred Lerner Artist Cove Performance Space

New York, NY

Cost estimating for the renovation of a 5,000 square feet performance space at Columbia University. The scope of work includes enhancement of finishes and MEP systems including new theatrical lighting, monument stair, and stage. Construction also contained addition of a green room, bathroom, and storage rooms to provide better functionality to the space.

Mx. Granger, CC0, via Wikimedia Commons

Owner: Columbia University

Completion: Ongoing

Services Provided: Cost Estimating, Cost Management

Columbia University Hartley Hall Renovation

New York, NY

Cost estimating for a full building renovation of 9 residential floors. The scope of work includes infrastructure updates, new floor layout, and new finishes throughout. The exterior enclosure is limited to new windows and minor new roof work and repair to existing copper roof where disturbed by new equipment or penetrations.

Owner: Columbia University in the CIty of New York

Services Provided: Cost Estimating, Cost Management

Columbia University - Manhattanville Campus Expansion

New York, NY

The new Columbia University campus will occupy two city blocks featuring: 18 buildings for science, academic, residential, and recreational facilities with seven levels of supporting underground facilities over 17 acres of prime Upper Manhattan real estate. This project involved performing cost estimating services in the initial planning stage of the development of the below-grade scope, which itself totals nearly 2 million square foot. These services included programmatic estimating, conceptual cost evaluations of the various design options, and proper cost allocations among proposed users.

Working with Gleeds New York, the estimates we prepared were extensive and detailed, requiring approximately ten (10) alternates for the below-grade construction, including several thicknesses of slurry wall foundation, conventional basement wall construction, top-down methods for construction, column-free spaces with long-span trusses, and multiple phasing options.

Owner: Columbia University

Completion: 2018

Services Provided: Cost Estimating, Cost Management

Columbia University - Manhattanville Development Phase 2

New York, NY

This project involves developing a detailed construction cost estimate for Phase 2 work at the Columbia University’s Manhattanville Campus development. We will provide cost estimates based on design documents and specifications, including detailed take-offs and related pricing.

The scope of work comprises the following elements within 4 levels below, grade, and street level:

  • Excavation and Foundations

  • Structural slabs

  • Fit-out to include all relevant interior construction, MEP and fire protection costs:

  • Level BG6 - Parking Program and stackers;

  • Level BG5 - CU Operation and Facility Shops, Manhattanville Central Loading Dock and Receiving;. Material service corridor

  • Level BG3 – Mechanical and Support MEP spaces for BG6 and BG5 program, utility tunnel

  • Level 1 – Temporary entrance/exit structures for Sites 7, 6B/6, truck and car entrance ramps

Owner: Columbia University

Completion: 2022

Services Provided: Cost Estimating, Cost Management

Columbia University, Perez Labs Fit-Out

New York, NY

Ellana provided cost estimating services to SpaceSmith for 4,250 square feet of laboratory fit-out and renovations at Pupin Hall and Nevis Cyclotron. The project includes partial interior demolition across several floors, and replacement of prefabricated glass for 1,000 clean rooms. The team provided costs for all disciplines and provided alternates, all of which account of escalation over a multi-year period.

Owner: Columbia University

Services Provided: Cost Estimating, Cost Management

Columbia University Uris Hall Renovation

New York, NY

Cost estimating for the redevelopment of a 203,000-square-foot, nine-story academic building to be relocated to Columbia’s new Manhattanville campus. The scope of work is estimated to include exterior site works, interior fit out, facade restoration, and MEP Upgrades.

Owner: Cornell University

Completion: 2025

Services Provided: Cost Management, Cost Estimating

Cornell University Day Hall Suite Renovation

Ithaca, NY

Cornell University is a private Ivy League land-grant research university founded in 1865. The team developed a comprehensive design to renovate the 1,000 SF Office of the Executive Vice President and CFO at Cornell University. Ellana’s cost estimate for interior renovation of Suite 317 included pricing on new partitions, finishes, and modifications to mechanical and electrical work.

Owner: New York State College of Agriculture and Life Sciences at Cornell University

Completion: 2023

Services Provided: Cost Management, Cost Estimating

SUCF Cornell University Plant Science Complex Renovation

Ithaca, NY

Ellana worked with Ellenzweig on a phased project for the School of Integrative Plant Sciences at the New York State College of Agriculture and Life Sciences at Cornell University. The Ithaca complex of interconnected buildings on the Cornell University campus serves as the primary base of operations for the school hosting administrative offices, classrooms, and teaching and research laboratories specifically equipped for the work.

During Phase 1, Ellana provided cost estimating for the renovation of a 172,000 SF, three-story science building, originally constructed in 1930. The scope of work includes interior, exterior, systems and selected site improvements, and two new fire lines.

Phase 2 features the renovation of a five-story science building, interior fit out, additional MEP work, façade repairs & window replacement plus two alternates schemes. This project is targeting LEED Silver version 4. The extended scope estimate includes an additional seven alternates.

Owner: Cornell University, Weill College of Medicine

Completion: 2007

Services Provided: Cost Management, Cost Estimating, Project Controls, Change Order Management

Cornell University - Weill College of Medicine Additions

New York, NY

This project involved assisting the owner with change-order estimates, preparation, and negotiations with contractors for additions to both the medical buildings and the parking garage. This project involved providing conceptual/budget estimates preparation for the interior fit-out of the various areas within core & shell building space. The proposed interior fit-out included laboratories, office spaces, and executive conference rooms, totaling 20,000 square feet.

Owner: City University of New York (CUNY)

Completion: 2012

Services Provided: Cost Management: cost estimating

CUNY Bronx Community College - Plaza

Bronx, NY

Ellana provided cost estimating services for the renovation of existing plaza, and removal/replacement of concrete slab, pavement and stair at the Bronx Community College Plaza.

Owner: Dormitory State of New York (DASNY), City University of New York (CUNY)

Completion: 2015

Services Provided: Cost Management: cost estimating

CUNY Brooklyn College – Whitman Hall

Brooklyn, NY

Ellana provided conceptual cost estimating analysis for the programming requirements at the Whitman Hall basement and Gershwin Theater, a link building known as the “Knuckle” building, at Brooklyn Center for the Performing Arts at Brooklyn College. Urbahn Architects assessed the existing conditions and categorized the extent of required repairs into three levels of work. Most renovations include architectural repair due to water damage in both Whitman Hall basement and the Knuckle building. Minimal MEP repair work was needed but the building has to be brought up to New York Building code. New office spaces and bathroom upgrades are included in the repair work as well.

Owner: City University of New York (CUNY)

Completion: 2019

Services Provided: Cost Management, cost estimating

CUNY City College of Technology - New Mixed-Use Academic Building

Brooklyn, NY

Ellana provided cost estimating services at SD, DD, and CD phases of design for the full replacement of 18,000 SF roofing system at the Pearl Bui lding in Brooklyn, NY. The scope of work included deck repairs, and MEP equipment temporary relocations we also included as part of the roofing system.

Owner: City University of New York (CUNY)

Services Provided: Cost Management, cost estimating

CUNY City College of Technology - New Mixed-Use Academic Building

Brooklyn, NY

Ellana provided cost estimating services at all stages of design for the new academic building at CUNY’s City College of Technology (formerly known as “City Tech”).  The project is located directly across the street from the college’s main campus in the downtown business district of Brooklyn. The new academic building comprises of  approximately 350,000sf of academic program, including: 27,200 sf for biology and anatomy laboratories and research space, 2,000 - 4,000 sf for the Nursing Department, 9,150 sf for chemistry laboratories and research space, dental and vision clinics, computer labs, 1,000-seat new theatre (auditorium), a new gymnasium, and a minimum of 18 parking spaces.

The new structure will also tie into the existing mechanical plant in the Namm Building across the street.  This involves digging a trench across the busy Jay Street below the surface of the roadway and above the A,C, & F subway lines below.  The foundations for the new building is also adjacent to the above mentioned subway lines and careful attention is paid to the line of influence of the existing subway tunnels during our review and preparation of the estimate.

Owner: City University of New York (CUNY), Dormitory Authority of the State of New York (DASNY)

Completion: Ongoing

Services Provided: Cost Management, cost estimating

CUNY City College of Technology - Various Roof Replacement

Brooklyn, NY

Ellana is providing cost estimating services for roof replacements at the Library Building (L), General Building (G), and Environmental Building (E). The project scope also includes the replacement of the roof of Building L terrace. The overall work area for this project is approximately 35,000 SF.

The present building roofs, which are all more than 30 years old, are showing signs of leaking and deteriorating. The program consists of removing and replacing existing roof equipment, bulkheads, roof structures, parapets, and copings.

Owner: The City University of New York (CUNY)

Completion: 2016

Services Provided: Cost Management: cost estimating

CUNY Graduate School of Journalism

New York, NY

Ellana provided cost estimating services from the schematic design to construction document phase of the one-story interior fit-out for CUNY School of Journalism.

The one-story renovation covers approximately 5,600 sf and is designed to contain program spaces for offices, conference/meeting rooms, workstations, bathrooms, and a lounge. The interior fit-out includes all new partitions, doors, finishes, and MEP systems.

Client: CUNY Hunter College

Completion: 2018

Services Provided: Cost Management, Cost Estimating, Schematic Design

CUNY Hunter College - Brecher Rehearsal Hall Renovation

New York, NY

Ellana provided schematic design cost estimating for the renovation of the 2,500 SF Brecher Rehearsal Hall at CUNY Hunter College. The scope of work included demolition of the existing space and providing new partitions, doors, millwork, and finishes including a linear wood veneer ceiling system. The project also consisted of upgrades to the fire protection, HVAC, and electrical systems.

Owner: CUNY Hunter College

Services Provided: Cost Management, Cost estimating

CUNY Hunter College Campus

New York, NY

Ellana provided cost estimating, cost management for various buildings on the CUNY Hunter College’s campus. These projects include:

Hunter College Master Plan

Cost estimating for the master plan. Provided many options and alternatives for mechanical systems. (2022)

Hunter College, Student Union

Cost estimating for the renovation of 10,500 square feet of recreational space that includes offices, a 3,000-square-foot game room, amenities, gathering and collaboration spaces and servery. (2017)

Hunter College Library

Cost estimating services for proposed renovation of the 6th -7th floors at Hunter College Wexler Library. Scope covers interior demolition/protection of two floors in the library which it’s scheduled to remain in operation during construction. The 40,600-square-foot renovation includes new interior finishes to accommodate the new layouts. (2015)

Hunter College, Brecher Rehearsal Hall Renovation

Cost estimating for the renovation of a 2,500-square-foot rehearsal space. The scope of work included demolition of the existing space and providing new partitions, doors, millwork, and finishes including a linear wood veneer ceiling system. The project also consisted of upgrades to the fire protection, HVAC, and electrical systems. (2018)

Tdorante10, CC BY-SA 4.0 <https://creativecommons.org/licenses/by-sa/4.0>, via Wikimedia Commons

Owner: City University of New York

Completion: Ongoing

Services Provided: Cost Management, Cost estimating

CUNY LaGuardia Community College, Cohen Career Collective

Queens, NY

The Cohen Career Collective renovation project is a 160,000 SF state-of-the-art workforce training center at LaGuardia Community College in Long Island City. The Cohen Career Collective includes specialized shops, labs, and classrooms for hands-on instruction and training. Study areas, student meeting rooms, a Career Services Center, computer labs, a lecture hall, storage areas, restrooms, locker rooms, mechanical rooms, electrical/data closets, and a Student Welcome Center are also featured in the design.

The center will be housed at C Building at 29-10 Thomson Avenue, originally built in 1913 as the Sunshine Biscuit Company. The fifth and sixth floor of this building will be renovated to accommodate the Cohen Career Collective. The project will meet LEED Silver standards.

Ellana served as cost estimator for this project. Our estimates included pricing for demolition, elevators, electrical / mechanical / plumbing service upgrades, and laboratory equipment.

Tdorante10, CC BY-SA 4.0 <https://creativecommons.org/licenses/by-sa/4.0>, via Wikimedia Commons

Owner: City University of New York (CUNY), DASNY

Completion: 2024

Services Provided: Cost Management, cost estimating

CUNY Medgar Evers College Founders Hall Expansion

Brooklyn, NY

Founders Hall at Medgar Evers College is the main gathering space on the college’s campus. The awarded design team expanded and upgraded the building which entailed the expansion of the venue’s seating capacity as well as new theatrical and building systems and the aesthetic enhancement of the auditorium. Ellana provided cost estimates for this cultural project. Improvements include:

  • Transforming Founders Hall into a “Signature Space”, providing an audience capacity of 1000-1500 people.

  • Providing a suitably sized stage for theatre productions, dance/music events, commencements and lectures with ADA access.

  • Introducing near-professional level audio-visual control room, lighting rigs and catwalks.

  • Providing an enhanced back-of-house area.

Owner: City University of New York (CUNY)

Services Provided: Cost Management, cost estimating

CUNY On-Call Term Services Contract

New York, NY

As part of Genesys Engineering’s on-call term services contract with the City University of New York, ELLANA provided cost estimating services for various MEP upgrades and stages of the design phase for the following colleges:

  • Queens College

  • Lehman College

  • School of Journalism

  • LaGuardia College

  • Marshak College - Phase III

  • Borough of Manhattan Community College

  • City College of New York

  • Medgar College

  • Mohawk College

  • Baruch College

  • Queens College Boiler Plant

Owner: Florida State University

Services Provided: Cost Management, Cost Estimating, Value Engineering

Florida State University Cost Estimating Term Contract

Tallahassee, FL

As part of our On-Call Estimating Contract with Florida State University (FSU), ELLANA provided conceptual, schematic design, design development, and construction document level estimates for various renovations and new construction projects across FSU’s campuses.

Owner: Harvard University

Services Provided: Cost Management, Cost Estimating

Harvard University, Science & Engineering Complex, Laboratory Fit Out

Allston, MA

School of Engineering and Applied Sciences (SEAS) houses the departments of applied computation, bioengineering, computer science, and robotics at Harvard University. Many SEAS functions are located at a new science complex in the Allston neighborhood of Boston at 150 Western Avenue.

Ellana provided cost estimating services for the interior fit out of the offices along with wet and dry labs on the fifth floor of the Science and Engineering Complex, one of the world’s most sustainable buildings featuring wet labs. These features include advanced solar shading strategies, adaptable ventilation methods, a high-performance heat recovery system, an energy-saving air cascade system, superior insulation, air-sealing techniques, triple glazing, and renewable energy. The building was occupied during construction of the interior fit out, and stringent temporary requirements were in place for protection, dust control, and acoustical control.

Our CD estimate for this 4,000 SF project included concrete, metals, woods & plastics, finishes, doors & hardware, windows, visual display markerboards, furnishings, fire suppression, MEP, and HVAC.

See below, CC BY-SA 3.0 <https://creativecommons.org/licenses/by-sa/3.0>, via Wikimedia Commons

Owner: LaSalle University

Completion: 2023

Services Provided: Cost Estimating, Cost Management, Value Engineering, Master Planning

LaSalle University Gola Arena, TruMark Financial Center and Athletic Master Plan

Philadelphia, PA

Ellana provided cost estimating and value engineering services for renovations to an existing basketball arena. Includes addition of club-level suites at the ground floor. The team performed a cost per square foot analysis study that was followed by design phase estimates for all disciplines. Ellana and Perkins and Will also collaborated on LaSalle Athletics’ Master Plan, that provided estimates for renovations to many sites across four phases and seven facilities inlcuding the basketball arena, recreation center addition, Trumark Financial Center renovations, field house renovations and addition, an East Campus team facility, McCarthy Stadium and Devincent Stadium.

Lincoln University, Public domain, via Wikimedia Commons

Owner The Commonwealth of Pennsylvania, Department of General Services (DGS)

Completion: 2013

Services Provided: Project Scheduling, Cost Estimating

Lincoln University - John Miller Dickey Hall Renovation

Chester County, PA

Ellana provided cost estimating and project scheduling services for the initial review of the project’s as-planned schedule to help expedite this effort and assure a complete and accurate CPM schedule from the beginning of the project.

John Miller Dickey Hall is a 60,000 SF, three-story structure, designed by Friday Architects/ Planners of Philadelphia. Dickey Hall houses Lincoln’s main computer facility, departments of mathematics and computer science, various departments in the social science division, computer-equipped classrooms, tutorial rooms, audiovisual-equipped lecture halls, and traditional offices. There is an adjacent parking for about 120 cars. The building is named in honor of the Rev. Dr. John Miller Dickey, who founded Ashmun Institute in 1854. Ashmun was renamed Lincoln University in 1866 in honor of slain U.S. President Abraham Lincoln.

Owner: Montclair State University

Completion: 2012

Services Provided: Cost Management, Cost Estimating

Montclair State University - Partridge Hall Feasibility Study

Montclair, NJ

Ellana provided cost estimating services for Montclair State University’s existing four-story, 49,000-square-foot building. The scope of work included extensive renovation of existing office spaces and classrooms, research areas, a feasibility study, and alternative roof and facade replacement.

Antony-22, CC BY-SA 4.0 <https://creativecommons.org/licenses/by-sa/4.0>, via Wikimedia Commons

Owner: Nassau Community College (NCC)

Completion: 2023

Services Provided: Cost Management, Cost Estimating

Nassau Community College Tower Mechanical Upgrade & Bathroom Renovation

Garden City, NY

Ellana provided cost estimating services for this task order for Elite as part of their NCC On- Call Construction Management Contract.

The task order for mechanical upgrades and bathroom renovation takes place at the Administrative Building, Tower (T) Building. The scope of work includes:

  • Abatement of all hazardous materials of all existing systems

  • Demolition and removal of significant portions of existing mechanical systems, equipment, and fixtures

  • Installation of new mechanical equipment and associated items in sub-basement

  • New HVAC System including BMS

  • New plumbing, isolation valves and associated items on all floors

  • Complete bathroom renovations; new fixtures and associated items

  • Testing and Commissioning of new systems and equipment

  • Training for new systems and equipment

Rendering Courtesy of Studio Gang

Owner: New York Institute of Technology (NYIT)

Completion: 2022

Services Provided: Cost Management, Cost Estimating

New York Institute of Technology, Biomedical Research & Innovation Center

New York, NY

Ellana provided cost estimating for a new 20,000-square-foot biomedical research and laboratory building, constructed atop the footprint of an existing building, slated for demolition. The Biomedical Research and Innovation Center (BRIC) supports medical and interdisciplinary microscope research and features flexible spaces to facilitate cross-collaboration. It is the first new building on the campus since 1988.

The new building is a self-sustaining building with timber framing, a clerestory glass system that invites natural light, and a geothermal system for heating and cooling with rainwater harvesting. The team “grafted” materials that splice existing building elements (roof decking, steel columns and beams from original building) and included new frame and glass elements.

The BRIC invites researchers from other institutions to utilize its advanced technological tools, filling a gap in microscopy resources currently available in the Long Island region. The new microscopy center represents an investment in the university’s architectural, educational, and environmentally conscious presence, focusing on the themes of sustainability, innovation, technology, interdisciplinary collaboration, enhancement of student life and the university’s research enterprise.

Owner: NYU

Completion: 2022

Services Provided: Cost Management, Cost Estimating, Change Order Analysis, Claim Impact Review

New York University, Education Campus

New York, NY

Ellana provided cost estimating, cost management, Local Law 11 report estimating, fit-outs, change order analysis and claim impact review and reconciliation services for various buildings on the NYU campus. These projects include:

18-26-30 Washington Place, Residential, Local Law 11, FISP Cycle 9A

Cost estimates for repair of façade and evelope repairs including direct construction costs, general contractor overhead and profit, design and construction and contingencies for more than 330,000 square feet of mixed-use and residential space. (July)

NYU Barney Building, 34 Stuyvesant Street, Second, Third and Fifth Floor Mechanical Fit-Out

Cost estimates for repairs and fit-out of mechanical systems for three non-contiguous floors of performing art and studio space that total 12,000 square feet. Work includes improvement to MEP and HVAC and fire protection systems, upgrades in electronic safety and security and increasing thermal and moisture protection systems. (September)

NYU Warren Weaver Hall, 211 Mercer Street, Curtain Wall Replacement, New York, NY

Cost estimating, change order analysis, claim impact review and reconciliation for pricing of a curtain wall replacement of a mathemetics and science building that includes partial demolition and site abatement. (November)

Our cost reporting work for NYU also includes providing costs for a confidential vault project.

Ajay Suresh from New York, NY, USA, CC BY 2.0 <https://creativecommons.org/licenses/by/2.0>, via Wikimedia Commons

Owner: NYU

Completion: 2022-2025; 2025-2030

Services Provided: Cost Management, Cost Estimating, Change Order Analysis, Claim Impact Review

New York University On-Call Estimating

Various, NY

As part of our on-call estimating services contract with New York University (NYU), Ellana provided cost estimating, cost management, Local Law 11 report estimating, fit-outs, change order analysis and claim impact review and reconciliation services for various buildings on the NYU campus. Our NYU portfolio includes:

  • 118-26-30 Washington Place, Residential, Local Law 11, FISP Cycle 9A, New York, NY

  • Barney Building, 2nd, 3rd, and 5th Floor Mechanical Fit Out, New York, NY

  • Warren Weaver Hall, 211 Mercer Street, Curtain Wall Replacement, New York, NY

  • Civil Engineering and Jacobs Administration Building Demolition, 6 MetroTech Center, Brooklyn, NY

  • Cycle 9B Facade Inspection Program, 719 & 721 Broadway Building Envelope Restoration New York, NY

  • Residences, Alumni Hall ADA Upgrades Feasibility, New York, NY

  • Rubin Hall Change Orders, New York, NY

  • Lillian Vernon Center ADA Upgrade Study, New York, NY

  • Carlyle 3 Unit Mockup Strategy, 25 Union Square West, New York, NY

  • Palladium Hall, Domestic Hot Water Electrification, 140 East 14th Street, New York, NY

  • Modular Chiller Replacement, Weinstein Residence Hall, New York, NY

  • Air Source Heat Pump Installation, 19 University Place, New York, NY

  • Carlyle Court C3 Building Renovation, New York, NY

  • Othermer Hall Renovation, 101 Johnson Street, Brooklyn, NY

Orchysterium, CC BY-SA 4.0 <https://creativecommons.org/licenses/by-sa/4.0>, via Wikimedia Commons

Owner: Ohio University

Completion: 2022

Services Provided: Cost Management, Cost Estimating

Ohio University Business School Renovations Feasibility

Athens, OH

Cost estimating for three options of the construction of a new school of business building alongside existing building renovations and site work. The study provided costs for a new 121,000 SF building, and 120,000 SF on renovations to existing structures. ELLANA provided costs for three approaches and varying building-and-renovation sizes to determine the most cost-effective (per square foot) method.